Innovations

  • No more screws and dowels needed
  • Reduction of number of required components from 4 to 3 compared to systems offered by the competition
  • Channeling of lateral forces into concrete shoulder ahead of bolt
  • Compatible with all existing processes, tools and machines from sleeper manufacturing to installation
  • Pre-assembly using clip-ons
  • No load pre-assembly position
  • Final assembly by simple 120° rotation of assembly to fixed stop
  • Decisive time savings since final assembly can be performed in one step and assembly errors, e.g. over tightening, are prevented.
Pre-assembly Position
Final Position